Can't the station revenue go up? Not only do you choose the right pile, but the full link service is the key to breaking the game.
Update time:2026-10-23 09:48
· amount of reading:10
When it comes to new energy charging stations, everyone's first reaction is to "plug in the gun to charge". But for the station operator, a charging pile is far more than "charging. Charging speed, operation and maintenance difficulty, environmental tolerance and safety protection, each of which directly determines whether the station can make money and manage well.

The above picture shows the charging station of Hefei Grand Theater.
Pile selection for construction of charging station: four problems often encountered:
1. The charging speed is slow, the vehicle queue is long, the parking space turnover is low, and the revenue cannot go up!
2. Equipment failure can only be investigated on site. Manual inspection takes time and money. If there is a problem, it is easy to receive complaints from car owners!
3. The open-air environment is windy and sunny, with high temperature in summer and severe cold in winter. The equipment is always on strike and the site selection is limited!
4. There are many electrical hidden dangers, incomplete protection, easy damage to equipment, and high risk of long-term operation of the station!
Today, through the G02 DC 3C charging pile of HKUST, how to solve these pain points by dismantling a qualified commercial DC pile in a popular science way.

Popular Science Points ①:
High-power fast charging, improve parking turnover, directly drive revenue
Pain point principle:
The core asset of the charging station is the parking space. The slower the charging speed, the longer the parking space occupied by a single car, the fewer vehicles received in a day, and the income is naturally limited. In particular, high-frequency energy-filling vehicles such as logistics vehicles and light passengers have higher requirements for charging speed.
G02 Solution:
Support 80-240kW high-power output, national standard interface compatible with passenger cars, logistics vehicles, light passenger all categories of new energy vehicles. High-power fast charging shortens the duration of energy replenishment. The same parking space can serve more vehicles in a single day, improve the turnover efficiency of the station, and improve the income of the station from the root.
Popular Science Point ②:
4G cloud intelligent control, reduce the labor cost of operation and maintenance
Pain point principle:
For traditional charging piles, if you want to know whether the equipment is normal, you need operation and maintenance personnel to inspect the site one by one. After the failure occurs, the owner often knows that the waiting time for the failure is long, the complaint rate is high, and the labor cost for operation and maintenance remains high.
G02 Solution:
Equipped with 4G Internet of Things module, support credit card/scan code dual start. Equipment status, charging data, abnormal alarm all on the cloud, remote real-time monitoring, fault active alarm, charging automatic settlement. Operation and maintenance personnel do not have to go to the site frequently, and can manage the whole station equipment in the background, greatly reducing the on-site manpower investment.
Popular Science Points ③:
IP54 wide temperature protection, adapt to multi-scene complex environment
Pain point principle:
Commercial charging piles are mostly installed in outdoor parking lots, high-speed, and logistics parks. Rain water, dust, high temperature in summer and low temperature in winter will accelerate the aging of equipment. The failure rate of ordinary charging piles soars in harsh environments, and many sites cannot build stations.
G02 Solution:
IP54 dustproof and waterproof grade,-30 ℃ ~ 50 ℃ ultra wide working temperature range. Regardless of the cold winter in the north, the hot summer in the south, the open air dust and humid environment, the equipment can operate stably. The high-speed service area, park parking lot, logistics hub and other venues can be adapted, and the site selection of the station is more flexible.
Popular Science Points ④
A full set of electrical multiple protection, build a solid station safety bottom line:
Pain point principle:
Charging piles are high-power electrical equipment, power grid fluctuations, line short circuits, lightning strikes, etc., may bring security risks. Once the protection function is lost, it will not only damage the equipment, but also bring potential safety hazards to the station.
G02 Solution:
Built-in over-current, over-voltage, short circuit, over-temperature, grounding, lack of phase, lightning, contactor adhesion and other full protection mechanism. Real-time monitoring of electrical status, rapid protection of power failure when abnormal, reduce the probability of equipment damage, extend the service life, and ensure long-term safe and stable operation of the station.

HKUST can pass, not only sell piles,Trinity capacity of station construction, operation and maintenance
Full-process station building capacity,One-stop turning sites into compliant charging stations
It is not a simple delivery wiring, but a full chain closed-loop service of preliminary planning-approval agency-construction landing-acceptance and delivery.
1.Survey Planning:On-site field survey, make power distribution plan, parking space layout and fire protection plan in combination with transformer capacity, site moving line and traffic flow, so as to avoid overload of power distribution and poor access of parking space;
2. AssistanceApproval:Assist in power reporting, data arrangement and acceptance docking;
3.Integrated construction:High and low voltage power distribution, canopy, monitoring, gate, lighting, charging pile synchronous standardized construction, its own licensed construction team;
4.Joint commissioning and delivery:The station's overall power-on test, platform access, initial test of trial operation, and delivery can be opened.
Has served the host factory, operators landed more than 2000 stations, covering passenger car fast charging, logistics heavy card, park, business circle, light storage integration and other scenarios.

HKUST can undertake the construction of Yi 'an Qi Super Charging Station, BYD Super Charging Station, Pole Krypton Super Charging Station and Ideal Super Charging Station.Ningde Times Chocolate Exchange Power Station Project
Digital Operations Capability,Use the platform to help the station to change the flow into revenue.
Self-developed charging and discharging intelligent management cloud platform [HKUST Nengtong] applet to get through the data of charging network, vehicle network and power grid, not simply looking at the data, but providing business tools:
1.Live Kanban:Visualization of station on-line rate, single pile utilization rate, charging duration, revenue, peak and valley power consumption;
2.Flexible price adjustment:Time-sharing electricity price, holiday price adjustment, night package, adaptation of peak and valley electricity difference, pull up gross margin;
3.Drainage of customers:Map navigation exposure, platform distribution, private domain membership, coupon marketing, revitalize idle time;
4.Orderly charging:Load control, to avoid the peak of electricity tripping, reduce the demand for electricity, to ensure the safety of the power grid.
Whether it is a self-operated station or a commissioned operation, you can choose the cooperation mode according to your needs.

Data Monitoring Platform of HKUST Nengtong Charging Pile
Nationalized operation and maintenance capability,Turn "repair if it breaks down" into "prevent failure in advance"
Many operation and maintenance difficulties, difficult in the network, response, standards three things, HKUST can set up a standardized operation and maintenance network:
1.Network coverage:300 localized service outlets, layout of seven regions, self-owned service vehicles and certified maintenance engineers, 7 × 24-hour customer service to receive reports, and dispatch orders nearby, thus shortening the arrival time
2.Remote pre-operation and maintenance:Relying on the platform to collect equipment data in real time, automatic alarm for abnormal current, temperature and module status, early warning of hidden dangers, waiting for the owner to report for repair; Remote investigation and OTA repair can reduce the number of visits;
3.Standardized on-site maintenance:Regular inspection, gun head maintenance, dust removal and heat dissipation, cable insulation detection, lightning protection and fire investigation; Fault replacement and station renovation and upgrading can be undertaken;
4.Warranty and Training:Own equipment supporting quality assurance, at the same time to the station operators to provide operation and maintenance training, teaching internal personnel simple investigation, reduce dependence costs.

HKUST Nengtong Undertakes Extremely Krypton and Ideal Car Overcharging Station Operation and Maintenance Project
Recommended Applicable Scenarios for G02 DC Charging Pile
✔Charging Station of Logistics Park
✔High-speed service area charging station
✔Park/Parking lot for enterprises and institutions
✔Urban public charging station
✔Scenic/Park Parking
✔Centralized energy replenishment sites for commercial and logistics vehicles
✔Main engine factory supporting flash charging station project
The University of Science and Technology can communicate, the pile of an million families can communicate with the future. If you have any needs for station construction planning and scheme consultation, please contact us: 132 1560 0191
- end -
Anhui Nengtong New Energy Technology Co., Ltd., brand name: USTEU, founded in 2014, headquartered in Hefei, China, has established branches in Hong Kong and Wuhan, and offices in Thailand, Malaysia and Vietnam, it is a national high-tech enterprise integrating R & D, manufacturing, sales, installation, after-sales, operation and maintenance, operation and vocational training, which specializes in providing new energy charging and discharging product system solutions, a national specialized and special new "little giant" enterprise, and a national key "little giant" enterprise.
The company has a research and development production base of 33554.3 square meters with an annual production capacity of 3 million units. It has been approved to set up a national post-doctoral research workstation, obtained research and development patents and qualification 150, and participated in the formulation of 9 national and group standards. It has a perfect quality management system. There are 300 global installation after-sales outlets, with a cumulative installation volume of 3 million. Cumulative shipments of 3.5 million units; AC and DC charging pile products have 3C, CQC, CE, UL, UK, CB, CHAdeMO, CCAP and other certifications (SIRIM, TISI, QCVN certification), selling well in nearly 10 countries at home and abroad.