USTEU | Penetration 47%! 8.6 million heavy-duty trucks are set to go electric, and the charging station boom is here.

Update time:2026-11-11 16:17

· amount of reading:17

The new-energy heavy-truck sector has entered a period of explosive growth, and high-power charging stations for heavy trucks are becoming a prime investment opportunity for investors in logistics, mining, and port industries.

First, let’s look at the latest industry statistics for 2026:

✅2026 Domestic new energy heavy card sales continued to increase, the first half of the new energy heavy card.Accumulated sales of 140000 vehicles, year-on-yearGrowth of 78.6%The highest monthly penetration rate exceeded 47%

✅Closed park short-haul transport scenarios take the lead in electrification: fixed-line short-haul transport scenarios such as mines, ports and logistics parks, and the penetration rate of new energy heavy trucks has beenMore than 70%, is the fastest electric landing, the most concentrated demand for the track

✅Eleven sectoral policies have clear targets: the penetration rate of new energy heavy trucks will reach 40% by 2030,Ownership exceeded 1.6 million vehiclesBeijing-Tianjin-Hebei, Fenwei Plain and other mining areas, port short-fall scene electric ratio requirements.Over 80%, the planning layout is about3000 heavy truck charging and switching stations

✅The stock replacement space is huge: the total number of heavy trucks in the country.Approximately 8.6 million.Vehicles, fuel heavy card phase-out replacement wave continued to release, fill energy infrastructure gap is huge, advance layout point is to seize the long-term revenue window.

Many bosses have sniffed the opportunity, but it is also easy to step on the pit:

The fast-charging pile of passenger cars is directly used by heavy trucks. The charging is slow, the failure rate is high, the dust and humid environment cannot carry it, the turnover of the fleet cannot be carried, and the revenue of the station is greatly reduced.

Heavy truck charging, and passenger cars are not a set of logic at all!


University of Science and Technology can pass charging pile

 


First understand: what is the difficulty in charging electric heavy trucks?

The battery capacity of electric heavy trucks is generally 500-800kWh, which is much larger than that of domestic passenger cars. If you use an ordinary charging pile within 240kW, it usually takes 2-3 hours for a car to charge from 20% to 80%. Heavy trucks make money by running trips. The longer the replenishment time, the fewer trips the fleet operates in a single day, which directly affects revenue.

At the same time, the scene of heavy truck station is special:

· Mine: large dust, large temperature difference between day and night

· Port: wet, salt spray erosion

Logistics Park: traffic flow is concentrated, vehicles queue up continuously for charging, and equipment needs 7 × 24 hours of high-intensity operation.

Ordinary charging pile protection level, power reserve, continuous load capacity, it is difficult to adapt to such harsh conditions.

Investment accounting: heavy card charging station, the income prospects are considerable.

Compared with the passenger car charging track is becoming more and more internal, heavy card high-power fast charging station is still in the dividend window period:

1.Single gun charging huge volume:A high-power gun can charge more than 600 kilowatt-hours of electricity in an hour. The single charging power of a single heavy truck is 5-10 times that of a passenger car. The daily charging power of a single pile in a high-quality station can reach more than 2500kWh, and the upper limit of single pile revenue is much higher than that of passenger car piles.

2.Stable demand, strong re-purchase:Mines, ports, and self-owned logistics fleets belong to fixed-line high-frequency energy replenishment, and vehicles have to be charged every day, unlike private cars, which have scattered charging time and strong randomness;

3.The return cycle is controllable:Location of high-quality, stable equipment of heavy truck stations, the return cycle is generally 1-3 years;

4.Policy dividend blessing:22 billion yuan ultra-long-term special government bonds, funds focus on supporting the old operating trucks to replace new energy heavy trucks, many places to replace the old for new subsidies continue to land, accelerate the replacement of fuel heavy trucks, the next few years heavy truck to fill the gap continues to enlarge, ahead of the layout of the station, to seize the replenishment of resources is to seize the long-term income of the central wide network

However, the premise of high yield is to select the special DC pile for heavy trucks with suitable working conditions, high power and high reliability. Frequent equipment failures and false charging power standards will directly eat up your profits.


University of Science and Technology can pass charging pile


Re-draw the focus: heavy truck charging station construction, the core look at these 4 points

1. High power is given priority, supporting double-gun concurrent heavy truck stations to pursue turnover efficiency, giving priority to high-power DC piles of 360kW and above, supporting simultaneous charging of double-gun, one pile serving two heavy trucks, improving site utilization rate and reducing queuing.

2. Environmental adaptability should be strong in mines, ports and open-air storage yards. Dust, rainwater and high and low temperature are normal. IP54 and above protection level is the basic threshold. Stable operation in wide temperature range can avoid power reduction in summer and startup failure in winter.

3. Intelligent operation and maintenance, reduce labor costs Most of the fleet sites are scattered, it is impossible to arrange special personnel to watch the piles. It is necessary to support 4G remote background, card swiping/code scanning start, automatic settlement, fault warning, remote viewing of equipment status, and reduction of on-site inspection manpower.

4. Continuous and stable loading, safety protection full heavy truck charging is a continuous operation with high current. The equipment must support long-term uninterrupted charging and complete protection mechanism. Overcurrent, overvoltage, short circuit, lightning strike and phase loss protection are indispensable to ensure long-term safe operation of the station.

Scenario-based solution... HKUST can pass heavy card charging pile.

HKUST Energy Heavy Truck Charging Pile is specially built for logistics parks, ports, mines and heavy truck stations. It directly hits the pain points of heavy truck replenishment and adapts to the commercial investment of heavy truck stations!


University of Science and Technology can pass charging pile


1. Super-power fast energy supplement360-640kW high-power models, double guns and charge, adapt to heavy truck large-capacity battery, greatly reduce the duration of energy replenishment, shorten the waiting time, improve the turnover efficiency of the fleet, pull up the station revenue.

2. Cloud intelligent operation and maintenance, worry-free operation and 4G remote control,Two starting methods: card swiping and code scanning, automatic billing, real-time fault warning, digital management of station operation, no special person on duty, continuous saving of labor costs, suitable for commercial operation of the fleet.

3. The harsh working conditions are calmly compatibleIP54 dustproof and waterproof,-30 ℃ ~ 50 ℃ wide temperature stable operationComplex sites such as mining areas, ports and open-air logistics parks can be installed flexibly without fear of dust, rain and high and low temperature tests.

4. Safety and stability, 7 × 24h continuous online full set of multiple safety protection, support 7 × 24 hours high-intensity continuous charging, equipment resistance and stability, long-term high-intensity use is not easy to failure, for heavy truck station long-term operation, stable income escort.

HKUST can pass, not only sell piles,Trinity capacity of station construction, operation and maintenance

Full-process station building capacity,One-stop turning sites into compliant charging stations

It is not a simple delivery wiring, but a full chain closed-loop service of preliminary planning-approval agency-construction landing-acceptance and delivery.

1.Survey Planning:On-site field survey, make power distribution plan, parking space layout and fire protection plan in combination with transformer capacity, site moving line and traffic flow, so as to avoid overload of power distribution and poor access of parking space;

2. AssistanceApproval:Assist in power reporting, data arrangement and acceptance docking;

3.Integrated construction:High and low voltage power distribution, canopy, monitoring, gate, lighting, charging pile synchronous standardized construction, its own licensed construction team;

4.Joint commissioning and delivery:The station's overall power-on test, platform access, initial test of trial operation, and delivery can be opened.

Has served the host factory, operators landed more than 2000 stations, covering passenger car fast charging, logistics heavy card, park, business circle, light storage integration and other scenarios.


Picture 4.png


HKUST can undertake the construction of Yi 'an Qi Super Charging Station, BYD Super Charging Station, Pole Krypton Super Charging Station, Ideal Super Charging Station and Ningde Times Chocolate Exchange Power Station Project


Digital Operations Capability,Use the platform to help the station to change the flow into revenue.

Self-developed charging and discharging intelligent management cloud platform [HKUST Nengtong] applet to get through the data of charging network, vehicle network and power grid, not simply looking at the data, but providing business tools:

1.Live Kanban:Visualization of station on-line rate, single pile utilization rate, charging duration, revenue, peak and valley power consumption;

2.Flexible price adjustment:Time-sharing electricity price, holiday price adjustment, night package, adaptation of peak and valley electricity difference, pull up gross margin;

3.Drainage of customers:Map navigation exposure, platform distribution, private domain membership, coupon marketing, revitalize idle time;

4.Orderly charging:Load control, to avoid the peak of electricity tripping, reduce the demand for electricity, to ensure the safety of the power grid.

Whether it is a self-operated station or a commissioned operation, you can choose the cooperation mode according to your needs.


Image 5.png


Data Monitoring Platform of HKUST Nengtong Charging Pile


Nationalized operation and maintenance capability,Turn "repair if it breaks down" into "prevent failure in advance"

Many operation and maintenance difficulties, difficult in the network, response, standards three things, HKUST can set up a standardized operation and maintenance network:

1.Network coverage:300 localized service outlets, layout of seven regions, self-owned service vehicles and certified maintenance engineers, 7 × 24-hour customer service to receive reports, and dispatch orders nearby, thus shortening the arrival time

2.Remote pre-operation and maintenance:Relying on the platform to collect equipment data in real time, automatic alarm for abnormal current, temperature and module status, early warning of hidden dangers, waiting for the owner to report for repair; Remote investigation and OTA repair can reduce the number of visits;

3.Standardized on-site maintenance:Regular inspection, gun head maintenance, dust removal and heat dissipation, cable insulation detection, lightning protection and fire investigation; Fault replacement and station renovation and upgrading can be undertaken;

4.Warranty and Training:Own equipment supporting quality assurance, at the same time to the station operators to provide operation and maintenance training, teaching internal personnel simple investigation, reduce dependence costs.


Picture 6.png


HKUST Nengtong Undertakes Extremely Krypton and Ideal Car Overcharging Station Operation and Maintenance Project


The University of Science and Technology can communicate, the pile of an million families can communicate with the future. If you have any needs for station construction planning and scheme consultation, please contact us: 132 1560 0191

Anhui Nengtong New Energy Technology Co., Ltd., brand name: USTEU, founded in 2014, headquartered in Hefei, China, has established branches in Hong Kong and Wuhan, and offices in Thailand, Malaysia and Vietnam, it is a national high-tech enterprise integrating R & D, manufacturing, sales, installation, after-sales, operation and maintenance, operation and vocational training, which specializes in providing new energy charging and discharging product system solutions, a national specialized and special new "little giant" enterprise, and a national key "little giant" enterprise.

The company has a research and development production base of 33554.3 square meters with an annual production capacity of 3 million units. It has been approved to set up a national post-doctoral research workstation, obtained research and development patents and qualification 150, and participated in the formulation of 9 national and group standards. It has a perfect quality management system. There are 300 global installation after-sales outlets, with a cumulative installation volume of 3 million. Cumulative shipments of 3.5 million units; AC and DC charging pile products have 3C, CQC, CE, UL, UK, CB, CHAdeMO, CCAP and other certifications (SIRIM, TISI, QCVN certification), selling well in nearly 10 countries at home and abroad.