Public Bidding Announcement: Anhui Nengtong Huagang Phase II Plant Project

Update time:2026-07-07 17:21

· amount of reading:5

Public Bidding Announcement

1. Tender Conditions

Anhui Nengtong Huagang Phase II plant project has been approved by the relevant competent authorities. The source of funds is self-raised by the enterprise, and the bidding unit is [Anhui Nengtong New Energy Technology Co., Ltd.]]. The project has already met the bidding conditions, and the environmental impact assessment service of the project is now open for bidding. Potential bidders who meet the qualifications are welcome to bid.

2. Project Overview

  1. Project Location:Northwest side of intersection between Fengle River Avenue and Qingcaohu Road in Feixi County

2. Project overview:This project is a new industrial plant construction project, with a total area of [16533.86 ㎡] and a total construction area of [33633.22 ㎡]. It mainly builds production workshops, warehouses, supporting office buildings and auxiliary public works, purchases production equipment, and builds a complete production Supporting system. In order to strictly implement the requirements of environmental protection examination and approval, the third-party organization is now open for bidding to complete the full set of environmental impact assessment preparation, evaluation and approval services for this project.

3. Project Name:Anhui Nengtong Huagang Phase II Plant Project

4. Scope of Service Bidding(1) Project site survey, regional environmental status monitoring, data collection and collation;(2) Prepare the environmental impact report form of the construction project;(3) Supporting surface water, noise, electromagnetic field, solid waste, soil status monitoring and data analysis;(4) Internal technical verification of EIA documents, expert review meeting organization, revision and improvement of the draft for review;(5) Cooperate with the whole process of technical review, publicity and approval of evidence collection by the Ecological Environment Bureau;(6) Preparation of environmental protection measures and emergency plans for environmental emergencies during the construction and operation periods;(7) Completion of environmental protection acceptance technical consultation, environmental protection account management system supporting documents.

5. Service cycle:Complete the preparation of the first draft of the EIA report within [20] calendar days from the date of signing the contract by both parties; complete the expert review and report finalization within [40] calendar days, and follow up the whole process until the EIA approval document is obtained (due to force majeure factors such as policy adjustment and process delay of the approval department, the cycle can be postponed)

3. Bidder Qualification Requirements

1. Subject qualification:Independent legal person, holding a valid business license, business scope including environmental impact assessment, environmental protection technical consultation, can independently bear civil liability;

2. Performance requirements:The performance of similar projects has completed at least one new industrial plant EIA project in the past 5 years and obtained EIA approval. Contracts and approval documents can be provided for future reference when signing up;

3. Compliance requirements:No environmental penalties, no bidding dishonesty, not included in the list of dishonest enforcers, major tax violations;

4. Do not accept the consortium bid, do not allow subcontracting, subcontracting the main body of the EIA work.

Obtain 4. Bidding Documents

Get platform:Online Email Registration (【HR@usteu.com】

Acquisition time:8 July 2026-10 July 2026

Provide registration information:Business license (sealed version), Annex I Bidder Registration Form and Bidder Commitment (sealed version).

5. Bid Submission

Closing time of bid opening:July 15, 2026, 12: 00 a.m. (Beijing time)

Submission Method:Online electronic bidding (email) [HR@usteu.com] paper sealed 1 original and 2 copies (bound into a book, sealed into a file bag, stamped with the official seal outside the cover);

Place of Bid Opening:Anhui Nengtong New Energy Technology Co., Ltd. Liheng Conference Room I.

6. Bid Evaluation Method

This project uses a comprehensive scoring method, scoring dimensions: business qualification performance (30 points), technical solutions (20 points), tender offer (50 points).

7. Publishing Media

WeChat Service Number: USTEU HKUST

Official website: www.usteuu.com

8. Contact Information

Tenderee: Anhui Nengtong New Energy Technology Co., Ltd.

Contact: Master Lu

Telephone: 19370747741

E-mail: [HR@usteu.com]]

Annex I: Registration Form of Bidder and Commitment of Bidder

Annex II: Quotation Schedule

Annex 3: Copy of the legal representative's ID card, power of attorney (if the legal person participates, this document is not required), and other formats are self-prepared.