Private pile sharing trend strikes, choose the right charging pile, self-use income generation is not wrong.
Update time:2026-09-21 15:51
· amount of reading:11
Many new-energy vehicle owners share a common frustration: their home charging piles are only used when they return home at night, leaving them idle in the parking space for most of the day.
As private pile sharing has slowly become a new trend in the industry, more and more car owners have discovered that idle household charging piles can be turned into a stable additional income. There is no need to rent additional space, only need to choose a charging pile to support shared operation, free time open to the public, electricity subsidies easily.

However, sharing private piles is not a simple matter of connecting the charging gun to the outside world. If you want to generate income with peace of mind, accurate billing, remote control and all-round security protection are indispensable. The W05 AC charging pile of HKUST is the preferred scheme to take into account the sharing of private piles for domestic use. One pile meets both needs.
Private piles share core pain points, HKUST can solve them at one time.
Many car owners dare not open private piles to share, and their concerns are nothing more than these points:
❌Can't charge separately, can't tell who charged how much electricity, can't calculate the income
❌No authority control, strangers start charging at will, unsafe
❌Outdoor environment, wind and rain worry about leakage, fault risk
HKUST can pass W05 AC charging pile, which perfectly solves the problem of private pile sharing.
※ 4G Networking Sharing Edition Easily Opens Private Pile Sharing
HKUST can pass W05 AC 3C charging pile to support scanning code start, background remote management, accurate metering and billing. In the idle period, you can open the external scanning code for charging, and the system will automatically record each charging amount, and the income will be clear and available. When you use your car, you can turn off the sharing authority at any time and leave it for your own use, which is flexible and controllable.
※ compatible with the vast majority of new energy vehicles on the market
HKUST can pass W05 AC 3C charging pile standard 5 m national standard cable, national standard GB/T charging interface, the market mainstream new energy models can be adapted. The 7kW version is more efficient and suitable for most home scenarios.
※ IP55 full scene protection, multiple security protection, sharing more peace of mind
In the sharing scenario, the users of charging piles are not fixed, and safety is the top priority. W05 has IP55 dustproof and waterproof grade,-25 ℃ ~ 40 ℃ wide temperature operation, underground garage, open parking spaces can be installed. Equipped with A 6 leakage protection, it integrates a full set of protection functions such as overvoltage, undervoltage, overcurrent, overtemperature, CP abnormality, short circuit, lightning protection, etc. 3C certified compliance products are fortified layer by layer for each charging, greatly reducing the potential safety hazard of shared charging.

The installation method is flexible, and two schemes of wall hanging and column are supported. The parking space is wall hanging on the wall surface, and the open parking space is installed directly on the column, which can be quickly deployed indoors and outdoors.

HKUST can provide one-stop service, from installation to after-sales process
Hassle-free installation service
Selecting a good pile is only the first step. Only professional landing and after-sales can support long-term private pile sharing operation.
✅On-site survey: professionals check the parking space, meter distance and line conditions on the spot, evaluate the safety of electricity use, and customize the optimal construction plan.
✅Standardized construction: the certified electrician team shall standardize the wiring, do a good job in grounding and lightning protection construction, and complete the installation and debugging in strict accordance with the national standard.
✅On-site teaching: after the completion of the power-on test, hand to teach you how to use, background management, sharing rights settings.

Enhance after-sales support
✅Quality assurance service: the whole machine enjoys a formal 2-year warranty, and hardware failure can be reported for repair.
✅Technical support: online customer service answers questions at any time, and remotely assists in troubleshooting networking, billing and other issues.
✅Fault maintenance: hardware failure, professional engineers on-site maintenance, rapid recovery of use
✅Continuous technology upgrade: The networked version supports background function iteration and adapts to subsequent operation requirements.

The essence of private pile sharing is to revitalize idle resources. If your parking space is vacant during the day and you want the charging pile to stop being idle and subsidize the electricity bill, HKUST can exchange 3C charging pile through W05, taking into account both self-use and sharing. Self-use peace of mind, sharing can be managed, safety compliance, the idle charging pile into your "small treasury".
Business consultation telephone number: 132 1560 0191





